banner of three images: demolition, childs work, new SOE building

From the N.E. Miles Early Childhood Development Center
In partnership with the School of Education at the College of Charleston

Contact Information:
Phone: (843) 953 - 5606
Fax: (843) 953 - 5608
E-mail: JaruszewiczC@cofc.edu

Photo Gallery

At the construction site, the children have observed how footers are dug and rebar is placed vertically in the concrete footers to provide strength to the concrete that is poured into the wooden forms.

IMG_1004

"The Powerful Crystal Stick of Egypt"

IMG_1003

Does this remind anyone of Stonehenge?

IMG_1000

Erika contemplates her next move as Steven goes to get the blue shovel he needs to finish the ‘special machines.’

IMG_0999

Everyone has a job to do; much conversation and consulting occurs during construction.

IMG_1002

Anna works on the part of the machine that turns it on and off

IMG_1013

School of Education construction site was used as inspiration

IMG_1012 IMG_1011
IMG_1010

IMG_1009

While on any given day, there would certainly be sand toys strewn about, these have been purposefully located in the ‘fuel depot.” (The machine needs fuel to operate)

IMG_1008

IMG_1007

Two special seats are needed for the operators of the machine.

IMG_1006

Digging, measuring, tamping, smoothing, and shaping are all activities that require the development of a variety of motor and cognitive skills.

IMG_0999

This is not just a pile of tennis balls – these are the ‘fireballs’ that have been strategically placed very carefully to be ready for use.

IMG_1001

Everyone had ideas and took responsibility for different aspects of the project, coming together periodically to make decisions and review the progress of the structure.

IMG_1014

This was hard work! We are really tired and we are done working….

Updated: October 23, 2006 - this site meets Section 508 and WCAG standards.